
Structural Steel Fabrication, Step by Step
How structural steel fabrication works, step by step: shop drawings, mill test reports, sawing, drilling, coping, welding, QC and shipping in a CNC shop.
Read the article
Plain answers on fabrication, erection, joists, deck and the paperwork behind them, from an AISC-certified fabricator in Aurora, Illinois, since 1919.

How structural steel fabrication works, step by step: shop drawings, mill test reports, sawing, drilling, coping, welding, QC and shipping in a CNC shop.
Read the article
Open web steel joists for GCs: K, LH and DLH series, joist girders, who designs them, bearing seat depths and the OSHA 1926.757 bridging rules.
Read the article
Steel erection in order: what OSHA requires before steel arrives, setting columns, bolting up, plumbing, deck and topping out, and how GIW manages it.
Read the article
Steel lintels for commercial masonry: loose angle lintels, back-to-back angles and shelf angles, bearing and deflection, and what a fabricator needs.
Read the article
Steel roof deck vs. composite floor deck and form deck: SDI profiles and depths, diaphragm fastening, construction loads and what the drawings must show.
Read the article
Planning a steel mezzanine floor? IBC Section 505 area limits, live load, column grid, the existing slab, stairs, guards, OSHA rules and the cost drivers.
Read the article
Design-build vs design-bid-build for structural steel: when the fabricator joins, who designs connections, mill order timing and value engineering.
Read the article
How to read a mill test report for structural steel: heat number, ASTM grade, chemistry, yield and tensile results, and the red flags inspectors catch.
Read the article
What AISC certification means for your project: how fabricators are audited, the current categories, IBC special inspection and how to verify a shop.
Read the article
Steel detailing and structural steel shop drawings explained: what is on them, how AISC 303 approval works, and how approved drawings become CNC data.
Read the articleFull Division 5 packages and fabrication-only work, from about 1 ton to over 1,000 tons.