Skip to content
AISC Certified Fabricator · AWS Certified Welders
Request a Quote
TCA Health: the two-story steel frame going up at sunset, with steel staged on the foundations
Healthcare · Chicago, IL

TCA Health

A 110-ton steel job. Structural steel fabrication by Garbe Iron Works of Aurora, Illinois.

The project

About this job

Garbe Iron Works completed the structural steel fabrication for TCA Health. The photos show the braced two-story steel frame going up beside the existing brick building. The job came to 110 tons of steel.

Medical buildings need stairs, railings and lintels along with the frame. GIW covers stairs, railings, lintels and platforms on the same package as the structural steel.

Your project

Have a job like this one?

Tell us about it. We quote full Division 5 packages and fabrication-only work.